HornwooD Office Projects Ltd
Home Page

 

The day of the build

Once we have agreed final drawings delivery is approximately 4 weeks. On the installation day the new furniture is unloaded and re-checked and the base units brought into the room and laid out. Almost everything arrives fully built direct from the factory unless we have a difficult access, we then request particular units to be flat packed.

Worktops are brought in and laid in position. If new carpets have been laid we may have to join the base units together but usually all we need to do is adjust the height adjustable feet on each unit till everything is flush and level.

Top units are finally placed on the desktops and are often fixed together with 2 round-headed chrome bolts in each. Shelves are put in place on 'invisible' runners and doors clipped into place.

If you have agreed cable port holes prior to delivery they will have been cut in the factory but we always carry a cutter and can add another cable port if required.

The room will be ready to move back into within a couple of hours, we have no packaging as everything is wrapped in blankets in our vehicles.

The quadrant units shown under the desktops in these photographs show efficient use of usually dead space and act as a cost efficient solution for the desk base.